Acea Run Rome The Marathon – Course Map and Elevation Profile
| Distance | 42.195 km |
|---|---|
| Route elevation | 132 m up · 132 m down |
| Highest point | 39 m · 36.6 km |
| Lowest point | 14 m · 8.6 km |
| Steepest climb | +2.5 % · 18.4 km |
| Steepest descent | −2.7 % · 17.6 km |
| Net elevation change | −1 m |
| Course type | Loop |
| Course record men | 2:06:24 · Asbel Rutto · 18 March 2024 |
| Course record women | no verified figure |
132 metres up and 132 down across 2 climbs worth the name. No single one decides the race; the sum of them does.
Course
Rom in numbers
- Distance
- 42.195km
- Ascent
- 132m
- Descent
- 132m
- Low / high
- 14 / 39m
- Flat-equivalent
- +0.67 %
- Steepest 50 m
- +2.5 %
Pace Planner
bergauf flach bergabWaagerecht: Distanz. Streifen unter dem Profil: mittlere Steigung je 500 m. Gestrichelte Linien sind Orientierungspunkte.
- Position
- 0.00 km
- Elevation
- 35 m
- Gradient
- +0.4 %
- Pace here
- 4:55 /km
- Elapsed
- 0:00
- Remaining
- 3:30:00
- Landmark
- —
Pacing table
| km | Point | Elevation | Gradient | up / down | Target pace | total | adjusted |
|---|---|---|---|---|---|---|---|
| 1 | 35 m → 32 m | −0.23 % | +1 m / −3 m | 4:55 | 4:55 | 4:55 | |
| 2 | 32 m → 34 m | +0.18 % | +4 m / −2 m | 5:00 | 9:55 | 4:55 | |
| 3 | 34 m → 30 m | −0.45 % | +3 m / −7 m | 4:56 | 14:50 | 4:55 | |
| 4 | 30 m → 30 m | +0.09 % | +3 m / −2 m | 4:59 | 19:49 | 4:55 | |
| 5 | 30 m → 26 m | −0.46 % | +1 m / −6 m | 4:54 | 24:43 | 4:55 | |
| 6 | 26 m → 20 m | −0.63 % | +2 m / −8 m | 4:54 | 29:37 | 4:55 | |
| 7 | 20 m → 17 m | −0.24 % | +1 m / −3 m | 4:54 | 34:31 | 4:55 | |
| 8 | 17 m → 21 m | +0.38 % | +5 m / −1 m | 5:03 | 39:34 | 4:55 | |
| 9 | 21 m → 16 m | −0.52 % | +2 m / −7 m | 4:54 | 44:29 | 4:55 | |
| 10 | 16 m → 17 m | +0.17 % | +3 m / −1 m | 4:59 | 49:28 | 4:55 | |
| 11 | 17 m → 19 m | +0.16 % | +5 m / −3 m | 5:01 | 54:29 | 4:55 | |
| 12 | 19 m → 27 m | +0.78 % | +8 m / −0 m | 5:09 | 59:38 | 4:55 | |
| 13 | 27 m → 15 m | −1.16 % | +1 m / −12 m | 4:49 | 1:04:27 | 4:55 | |
| 14 | 15 m → 23 m | +0.75 % | +8 m / −0 m | 5:07 | 1:09:34 | 4:55 | |
| 15 | 23 m → 21 m | −0.22 % | +2 m / −4 m | 4:56 | 1:14:30 | 4:55 | |
| 16 | 21 m → 28 m | +0.71 % | +8 m / −1 m | 5:08 | 1:19:38 | 4:55 | |
| 17 | 28 m → 31 m | +0.32 % | +4 m / −1 m | 5:01 | 1:24:39 | 4:55 | |
| 18 | 31 m → 17 m | −1.37 % | +1 m / −15 m | 4:49 | 1:29:28 | 4:55 | |
| 19 | 17 m → 30 m | +1.25 % | +14 m / −2 m | 5:18 | 1:34:46 | 4:55 | |
| 20 | 30 m → 28 m | −0.14 % | +3 m / −4 m | 4:57 | 1:39:43 | 4:55 | |
| 21 | 28 m → 29 m | +0.06 % | +2 m / −1 m | 4:57 | 1:44:40 | 4:55 | |
| 22 | 29 m → 32 m | +0.31 % | +3 m / −0 m | 5:01 | 1:49:41 | 4:55 | |
| 23 | 32 m → 30 m | −0.20 % | +0 m / −2 m | 4:54 | 1:54:35 | 4:55 | |
| 24 | 30 m → 28 m | −0.16 % | +0 m / −2 m | 4:55 | 1:59:30 | 4:55 | |
| 25 | 28 m → 19 m | −0.89 % | +0 m / −9 m | 4:50 | 2:04:20 | 4:55 | |
| 26 | 19 m → 21 m | +0.14 % | +1 m / −0 m | 4:58 | 2:09:18 | 4:55 | |
| 27 | 21 m → 19 m | −0.17 % | +0 m / −2 m | 4:54 | 2:14:12 | 4:55 | |
| 28 | 19 m → 19 m | −0.04 % | +1 m / −1 m | 4:56 | 2:19:08 | 4:55 | |
| 29 | 19 m → 20 m | +0.11 % | +2 m / −1 m | 4:58 | 2:24:06 | 4:55 | |
| 30 | 20 m → 25 m | +0.50 % | +5 m / −0 m | 5:03 | 2:29:09 | 4:55 | |
| 31 | 25 m → 30 m | +0.49 % | +5 m / −0 m | 5:03 | 2:34:13 | 4:55 | |
| 32 | 30 m → 24 m | −0.61 % | +0 m / −6 m | 4:52 | 2:39:05 | 4:55 | |
| 33 | 24 m → 19 m | −0.51 % | +0 m / −5 m | 4:52 | 2:43:57 | 4:55 | |
| 34 | 19 m → 25 m | +0.60 % | +7 m / −1 m | 5:06 | 2:49:03 | 4:55 | |
| 35 | 25 m → 29 m | +0.41 % | +4 m / −0 m | 5:02 | 2:54:05 | 4:55 | |
| 36 | 29 m → 34 m | +0.50 % | +5 m / −0 m | 5:03 | 2:59:09 | 4:55 | |
| 37 | 34 m → 36 m | +0.24 % | +5 m / −3 m | 5:02 | 3:04:11 | 4:55 | |
| 38 | 36 m → 29 m | −0.72 % | +0 m / −7 m | 4:51 | 3:09:02 | 4:55 | |
| 39 | 29 m → 32 m | +0.35 % | +3 m / −0 m | 5:01 | 3:14:03 | 4:55 | |
| 40 | 32 m → 26 m | −0.65 % | +1 m / −7 m | 4:52 | 3:18:55 | 4:55 | |
| 41 | 26 m → 30 m | +0.39 % | +6 m / −2 m | 5:03 | 3:23:58 | 4:55 | |
| 42 | 30 m → 35 m | +0.53 % | +6 m / −1 m | 5:05 | 3:29:03 | 4:55 | |
| 42.20 | 35 m → 34 m | −0.62 % | +0 m / −1 m | 4:52 | 3:30:00 | 4:55 |
The course, kilometre by kilometre
Start and finish are 22 metres apart: the Acea Run Rome The Marathon is a loop.
Highest and lowest point are 25 metres apart, and start and finish are at practically the same height.
The race is held in Rom, Italy, in March, on tarmac throughout.
Elevation gain and climbs
132 metres up and 132 down across 2 climbs worth the name. No single one decides the race; the sum of them does.
The hardest stretch runs from km 18.3 to 19.2: 16 metres at 1.7 % on average.
Against a 3:30 target the terrain costs about 1 minute compared with a flat loop. Adjust for gradient and what remains is what the legs actually paid.
The route on the map
The course runs as a loop through Rom and finishes 22 metres from where it started.
The GPX data of this course
The smoothed profile is stored every 50 metres: 845 points with latitude, longitude, elevation and gradient. The elevations here do not come from the course file but from a terrain model: the ones in the original were unusable.
We do not hand this course out as a file: the line comes from a third-party source and is not ours to pass on. Once a course is built from runners’ own recordings, the file appears here.
Common questions
- How hilly is the Rom Marathon?
- 132 metres of ascent and 132 of descent over 42.195 km. 79 % of the course sits between −1 and +1 per cent, and 0 % steeper than three. That makes it a rolling course.
- Where is the hardest section?
- Between km 18.3 and 19.2, gaining 16 metres at 1.7 % on average. The steepest single ramp is at km 18.4 at 2.5 %, the steepest descent at km 17.6 at −2.7 %.
- Is this a good course for a personal best?
- Minetti's cost model puts this course at 0.67 % against a flat one. On a three-and-a-half-hour target that is roughly 1 minutes.
- Is the course a loop?
- Yes. Start and finish are 22 metres apart.
- Where does this elevation data come from?
- Streckendatei „Run Rome The Marathon 2025 – 42.195 km“ von goandrace.com (Garmin-Connect-Export), übergeben am 18.08.2026, 734 Punkte. Elevation: Geländemodell (Terrarium/AWS), 25-m-Abtastung — die Höhen der Datei korrelieren mit dem Gelände nur zu 0,42 und nennen 61 m auf einer Strecke, für die das Gelände 132 m gibt.
Similar courses
Analyse your race
Have you run this course? Upload the file from your watch and see, kilometre by kilometre, how much of it was the terrain and how much was your legs.
Upload your race file